Buyers Blueprint · paid onboarding

The Buyers Blueprint: everything you make and do, put in ink

The Buyers Blueprint is our paid industrial marketing consulting engagement and the first step of every program. We capture what your company really makes and does from your website, your documents, an on-site visit and your team. In your first month, led by Matt Barden, we confirm every fact with you, read your competitors and your market, and hand you a concise plan, a wireframe of every page and a content brief.

What the Blueprint takes

  • Buyers Blueprint

    One Blueprint: your first month

    Paid, and the first month of every program. Matt Barden leads it. It ends with a concise plan, a wireframe site strategy and a content brief, and from Month 2 our whole agency works through the plan.

    • Most of your team's time goes on two sessions: one on-site visit and one Question Round
    • Deliverables you keep, in formats your own team can use
    • Purchase orders welcome: quote, W-9 and vendor setup in one packet
  • Since 2012

    marketing for manufacturers

  • Hundreds

    of companies worked with

  • Month to month

    after the Blueprint

  • Owner-led

    Matt and Mark on every Blueprint

See the process

The Walkdown: what one on-site visit captures

On the on-site visit, we go round your floor with you and your lead programmer. Every remark becomes a note on one cited record, and nothing goes public without your yes.

Sheet 201, The Walkdown: REV A as said beside REV F released Two-panel as-built drawing from an on-site visit. Left, REV A as said: a precision shop's website, harrowfield-mfg.test, drawn as the as-designed sheet: CNC milling, CNC turning and ISO 9001, then a red revision cloud around an empty space marked Not on the site. In the margin, red-pencil field redlines from the walk with the owner and the lead programmer: We run those sensor mounts every quarter; Never thought to put it on the site; wire EDM in the back bay, tenths routine; passivation per AMS 2700 in house; heat treat via a partner with certs in the package; and prime program names under NDA. Red arrows point into the cloud; a faint box reads No record yet. Right, REV F released: the same website sheet, now as built, lists the quarterly 17-4 PH mounts, wire EDM, passivation and partner heat treat with gold revision deltas. Beside it, the record: one cited row per remark, each climbing Inferred, Suggested, Confirmed and Ratified; rows 1 to 4 pass a gold check valve labelled Your yes and reach Public, while row 5, prime program names, is held and never reaches a page. Below, a P&ID check valve CV-1 with a Yes actuator: nothing flows out without your yes. Illustration; shop invented. REV A · AS SAID AS DESIGNED, AGAINST THE FLOOR REV F · RELEASED ONE CITED RECORD THE FLOOR SAYS MORE THAN THE SITE. IT LIVES IN RED PENCIL. EVERY REMARK A CITED ROW. NOTHING FLOWS OUT WITHOUT YOUR YES. GENERAL NOTES 1. ILLUSTRATION. SHOP, DOMAIN AND REMARKS ARE INVENTED (.TEST). THE BUYERS BLUEPRINT IS PAID. 2. LADDER: INFERRED, SUGGESTED, CONFIRMED (BY YOU), RATIFIED (BY US), PUBLIC (ON YOUR YES). 3. A NO IS KEPT AS A NO. HELD ROWS NEVER REACH A PAGE. TITLE THE WALKDOWN ILLUSTRATION · INVENTED COMPANIES (.TEST) SHEET201 REVF SCALE NTS · DRN IM INDUSTRIAL MARKETING harrowfield-mfg.test HOME · CAPABILITIES · QUALITY · CONTACT PRECISION CNCMACHINING CAPABILITIES CNC MILLING, ±0.001 IN CNC TURNING ISO 9001 REGISTERED NOT ON THE SITE WHAT THE FLOOR RUNS CONTACT · SEND AN RFQ AS DESIGNED REV A WEBSITE · SHT 1 ON-SITE VISIT · OWNER + LEAD PROGRAMMER 1 “WE RUN THOSE SENSOR MOUNTS EVERY QUARTER.” LEAD PROGRAMMER · 17-4 PH, WELDED, EDM SLOTS “NEVER THOUGHT TO PUT IT ON THE SITE.” OWNER 2 WIRE EDM IN THE BACK BAY, TENTHS ROUTINE SEEN ON THE WALK 3 PASSIVATION PER AMS 2700, IN HOUSE QUALITY MANAGER 4 HEAT TREAT VIA PARTNER, CERTS IN THE PACKAGE OWNER 5 PRIME PROGRAM NAMES: UNDER NDA OWNER · NOT FOR THE SITE NO RECORD YET REMARKS LIVE IN RED PENCIL AND MEMORY NO SOURCE, NO LADDER, NO PAGE harrowfield-mfg.test HOME · CAPABILITIES · QUALITY · CONTACT PRECISION CNCMACHINING CAPABILITIES CNC MILLING, ±0.001 IN CNC TURNING ISO 9001 REGISTERED 1 17-4 PH MOUNTS, EVERY QUARTER 2 WIRE EDM, ±0.0002 IN SLOTS 3 PASSIVATION PER AMS 2700 4 HEAT TREAT VIA PARTNER, CERTS EACH LINE CITED · SHOWN ON YOUR YES CONTACT · SEND AN RFQ AS BUILT REV F WEBSITE · SHT 1 THE RECORD · ONE CITED ROW PER REMARK INFERRED SUGGESTED CONFIRMED RATIFIED YOUR YES PUBLIC 1 MOUNTS, EVERY QUARTER SRC: LEAD PROGRAMMER 2 WIRE EDM, TENTHS SRC: ON-SITE VISIT, BACK BAY 3 PASSIVATION, AMS 2700 SRC: QUALITY MANUAL 4 HEAT TREAT VIA PARTNER SRC: PARTNER CERT FILE 5 PRIME PROGRAM NAMES SRC: OWNER · UNDER NDA HELD NOTHING FLOWS OUT WITHOUT YOUR YES RATIFIED YES PUBLIC CV-1 CV-1 · CHECK VALVE: ONE WAY, ON YOUR YES A NO IS KEPT AS A NO. ROW 5 STAYS IN THE RECORD.

What happens

  1. 01Your website says what it always has: CNC milling, CNC turning, ISO 9001
  2. 02On the visit, your team mentions the work nobody thought to list
  3. 03Each remark goes on one record with its source, and you confirm it
  4. 04Nothing leaves the record without your yes
  5. 05What you confirm becomes a page a buyer can find

Why the Blueprint comes first

The Blueprint comes first because everything we make for you afterwards draws on the facts it captures. Most plants say only part of what they can do. The rest lives in the quality manual, old quotes and your programmers' heads, where no buyer, search engine or AI assistant can read it.

The Blueprint writes it down once, with a source for every line. Every page, post and ad after that draws on it, and so do SiteSonar and IKE, our Industrial Knowledge Engine. You can't sell what you don't say.

How the Buyers Blueprint works, step by step

The Blueprint runs in eight steps, in this order. Most of the work is ours: we read everything before we ask you anything.

  1. Step 1, OP 10

    Kickoff (about 30 min)

    Tell us the work you want more of and the three shops you lose jobs to, and send what documents you have. Your private client portal opens.

  2. Step 2, OP 20

    We read your website (none of your time)

    We cite every page you've published, then read three competitors, search demand and what AI assistants say about you.

  3. Step 3, OP 30

    Your documents

    Quality manual, cert scopes, equipment list, old quotes. Each line becomes a fact with its source; anything unclear becomes a question.

  4. Step 4, OP 40

    The on-site visit

    On an on-site visit, we go round your floor with the people who run it and note the work nobody thought to mention.

  5. Step 5, OP 50

    The Question Round (30-60 min)

    One session, built only from the gaps we found. No line-by-line homework for your team.

  6. Step 6, OP 60

    One cited record

    Every fact climbs a ladder: inferred, suggested, confirmed by you, ratified by us, and public only with your yes.

  7. Step 7, OP 70

    Plan, wireframe and content brief

    A person writes the positioning ruling from the evidence. Then you get the concise Blueprint plan, a wireframe of every page your site should have and a content brief for what each one says. You approve each page: yes, no or later.

  8. Step 8, OP 80

    Review and release

    We walk you through the deliverables, and you keep them. From Month 2, the agency works through the plan in the program you choose.

Each Blueprint step, in depth

What your Blueprint teaches IKE

Your Blueprint is where IKE, our Industrial Knowledge Engine, learns your company. What it learns about the trade sharpens every later question. What IKE learns is manufacturing. Your record stays yours.

  • What it teaches IKE

    What plants run that their websites never say: the techniques, partners and limits that set one shop apart, and how one process leads to the next.

  • What IKE gives back to you

    Questions built from what your trade runs. Your plant read against your competitors combined and the markets you want. A page plan ranked by what buyers screen for.

What you get and keep

You keep every deliverable, in formats your own team can use.

What the Blueprint finds on very different manufacturing floors

Different industries, the same gap: work the plant runs that the website never says.

Why it matters: tied on specs, lost on the ops you never said

Two shops tie on material, machines and certs. The RFI goes to the one whose website lists the finishing, inserts, assembly, marking and test you also run.

Sheet 101, Won on Secondary Ops: REV A as said beside REV F released Two-panel drawing. Left, REV A as said: RFI 26-118 for an electronics housing assembly, drawn in top and side view with balloons for its nine drawing notes. A note table compares your shop with Competitor B. Notes 1 to 4, the first-order notes (plate, five-axis machining, AS9100D, CMM first article), are said by both. Notes 5 to 9, the second-order ops (Type III hard anodize, thread inserts, EMI gasket and connector plate, UID mark to MIL-STD-130, leak test), are not said by you; Competitor B says 5 to 8 and neither says the leak test. A gauge shows you at 4 of 9 and Competitor B at 8, against a shortlist cut of 7. Stamp: RFI closed, not shortlisted; you never see the RFQ. Right, REV F released: a plan of your floor as found, with the anodize line, assembly bench, laser marker by the CMM and the leak-test stand behind the tool crib, each captured in the Blueprint and given a page a buyer checks. The same RFI rerun: all nine notes said, you 9 of 9, Competitor B 8, stamped shortlisted. Illustration; shops invented. REV A · AS SAID RFI 26-118 · ISSUED REV F · RELEASED RFI 26-118 · RERUN FIG. 1 · ELECTRONICS HOUSING ASSY · RFI 26-118 SIDE 2 8 5 6 7 9 NO DRAWING NOTE YOU COMP B 01 6061-T651 PLATE SAID SAID 02 5-AXIS ±0.001 IN SAID SAID 03 AS9100D SAID SAID 04 CMM · AS9102 FAI SAID SAID 05 HARD ANODIZE TYPE III NOT SAID SAID 06 THREAD INSERTS NOT SAID SAID 07 EMI GASKET + PLATE NOT SAID SAID 08 UID MARK MIL-STD-130 NOT SAID SAID 09 LEAK TEST (PREFERRED) NOT SAID NOT FOUND 1-4 FIRST-ORDER · 5-9 SECOND-ORDER (SHADED) WHAT THE BUYER CAN READ · NOTES SAID, OF 9 · ILLUSTRATION 0 1 2 3 4 5 6 7 8 9 YOU COMP B 04 08 SHORTLIST CUT 7 RFI CLOSEDNOT SHORTLISTED YOU NEVER SEE THE RFQ. NOBODY CALLS TO ASK ABOUT YOUR ANODIZER. REV E · AS FOUND ON YOUR FLOOR · PLAN 5-AXIS CMM LASER MARK TOOL CRIB ANODIZE LINE ASSY BENCH LEAK TEST STAND 5 6 7 8 9 BLUEPRINT RECORD → PAGES A BUYER CHECKS · EXAMPLE 05 /hard-anodize-type-iii 06 /thread-insert-installation 07 /emi-gasket-sub-assembly 08 /uid-marking-mil-std-130 09 /leak-testing NO DRAWING NOTE YOU COMP B 01 6061-T651 PLATE SAID SAID 02 5-AXIS ±0.001 IN SAID SAID 03 AS9100D SAID SAID 04 CMM · AS9102 FAI SAID SAID 05 HARD ANODIZE TYPE III SAID SAID 06 THREAD INSERTS SAID SAID 07 EMI GASKET + PLATE SAID SAID 08 UID MARK MIL-STD-130 SAID SAID 09 LEAK TEST (PREFERRED) SAID NOT FOUND 1-4 FIRST-ORDER · 5-9 SECOND-ORDER (SHADED) WHAT THE BUYER CAN READ · NOTES SAID, OF 9 · ILLUSTRATION 0 1 2 3 4 5 6 7 8 9 YOU COMP B 09 08 SHORTLIST CUT 7 SHORTLISTEDRFQ TO FOLLOW NOTE 9 LEAK TEST: NOW YOU SAY IT. COMP B STILL DOESN'T. PRICE AND LEAD TIME WIN ORDERS. TIED ON NOTES 1-4. NOTES 5-9 INK ONLY FOR COMPETITOR B. CUT AT 7. EVERY OP YOU RUN, IN INK. SAME RFI, RERUN: YOU 09, COMPETITOR B 08. GENERAL NOTES 1. ILLUSTRATION. BOTH SHOPS AND RFI 26-118 ARE INVENTED. SCORES ARE NOT MEASURED. 2. NOTES 1-4 GET YOU READ. NOTES 5-9, THE SECOND-ORDER OPS, DECIDE WHO GETS THE RFQ. 3. THE BUYERS BLUEPRINT IS PAID ONBOARDING. INK GETS YOU SHORTLISTED, NOT THE ORDER. TITLE WON ON SECONDARY OPS ILLUSTRATION · INVENTED COMPANIES (.TEST) SHEET101 REVF SCALE NTS · DRN IM INDUSTRIAL MARKETING

What happens

  1. 01Two shops, one RFI
  2. 02Both say the basics: material, machines, certs and inspection
  3. 03Only the competitor says the finishing, inserts, assembly and marking you also run
  4. 04The RFI closes, and you never see the RFQ

Selling to defense and aerospace primes

Primes screen paperwork before capability, so the Blueprint builds both from one record: procurement-ready pages and a government capability statement. We sign an NDA first if you ask.

Why pay for a Blueprint? A check diagnoses; the Blueprint prescribes

You pay because the Blueprint prescribes from your floor. A check or a chat reads you from the outside.

A free website checkA plan from an AI chatThe Buyers Blueprint
SourcesYour public websiteWhat the model has read about shops like yoursYour website, documents, floor and team
What it tells youWhat's wrong on the pageThe default plan for an average shopWhat your plant can win, and the pages to win it
Facts checked with youNoNoEvery one, before anything goes public
Who writes the positioningNobodyA modelA person, from evidence
What you keepA scoreA chat logA cited record and the plan built on it

More stories from Blueprint work

Short lessons from real plant floors, each with three checks you can run on your own site.

How to buy the Blueprint, and what happens next

There is one Blueprint, and it is your first month with us, led by Matt Barden. It starts with the free Buyer's-Eye Audit. On the 20-minute review call after it, we show you what a buyer sees, and if a Blueprint fits, we agree your goal and when Month 1 starts. If it isn't a fit, we say so plainly. Purchasing gets a formal quote, our W-9 and PO instructions after that call.

After the Blueprint, IKE keeps learning your company, and SiteSonar names the companies visiting your site and what they read, and we hand over likely prospects there who fit your ideal customer profile. From Month 2, our whole agency works through the plan, building and growing your site in the program you choose, month to month.

Questions about the Blueprint

What is the Buyers Blueprint?

Our paid industrial marketing consulting engagement and the first step of every program. We capture what you can do from your website, documents, floor and team, confirm it with you on one cited record, and plan every page buyers need.

What does your industrial marketing consulting include?

The Blueprint is the consulting engagement: a cited capability record, competitor and market reads, a positioning ruling written by a person, a wireframe site strategy you approve, a content brief, a capability statement and the Blueprint plan.

How much does the Buyers Blueprint cost?

The Blueprint is one month of work, led by Matt Barden. We put the price in writing on the review call after your free Buyer's-Eye Audit, before you commit, and purchasing gets a formal quote.

Why pay for a Blueprint instead of a free audit or an AI-written plan?

A free check diagnoses from the outside, and an AI plan is the default plan for an average shop. The Blueprint prescribes from your floor: facts you confirm, and a page plan built on them.

How much of my team's time does it take?

Most of it goes on two sessions: one on-site visit and one Question Round. The rest is ours.

We're a distributor, lab or engineering firm. Does the Blueprint fit?

Yes. The steps are the same. The on-site visit covers your warehouse, lab or shop, and the record holds the lines and services your buyers check.

Can we pay by purchase order?

Yes. Get a quote, our W-9 and PO instructions on the quote page.

Start with a Blueprint

Start with the free Buyer's-Eye Audit. We set up your Blueprint on the review call after it.

  • Buyers Blueprint
  • paid
  • your first month, led by Matt Barden
  • from Month 2 the agency works the plan