Foundation

Foundation: your Blueprint plan steers the work

In Foundation, the plan from your Buyers Blueprint steers. Our team works through it in order, using whichever tools it calls for, from website pages to blog posts and search. You reach us by email any time and by up to two Huddles a month, and a weekly brief shows what shipped and what's next.

SHT 605, New Machine on Tuesday: REV A as said beside REV F releasedTwo-panel drawing sheet, illustration. Left, REV A as said, Tuesday 7:00 AM: an overhead crane lowers a new 5-axis trunnion machine through dock door 2 at Brightwater Machine, an invented shop; its crate's tag is blank, no page yet. The website's equipment page lists 3-axis vertical mills and CNC turning centers; 5-axis machining is only a faint pencil line, not on the site. Two shop travelers carry the same job, add new machine to site. Traveler A, in-house: the machine is item 14 on one busy list after the trade show, quote follow-ups and the new catalog; status, when there's time. Traveler B, project agency: quote is signed, then change order, approval, schedule and build wait in pencil; not in last year's scope. Right, REV F released: the machine stands on the floor cutting an impeller, the crate is open, and its tag in gold reads brightwatermachine.test/equipment/5-axis/. The new equipment page says 5-axis machining with a work envelope drawing, X 650, Y 520, Z 475 millimetres, the materials it cuts and the jobs it opens up: impellers and manifolds. Traveler C, a program, has one op, build, written from the Blueprint record, approved by the shop and stamped released; one ticket sits on top of the program's queue. The next machine takes the same route.665544332211CCBBAAREV A · AS SAIDTUESDAY · 7:00 AMREV F · RELEASEDILLUSTRATIONDOCK DOOR 2NEW 5-AXISTAG: NO PAGE YETELEVATION · DOCK, TUESDAYbrightwatermachine.test/equipment/EQUIPMENT3-AXIS VERTICAL MILLSCNC TURNING CENTERS5-AXIS MACHININGSITE SAYS: 3-AXIS MILLING + TURNINGJOB: ADD NEW MACHINE TO SITEA · IN-HOUSEONE BUSY LIST01 TRADE SHOW02 QUOTE FOLLOW-UPS03 NEW CATALOG04 ···14 NEW MACHINESTATUS:WHEN THERE'S TIMEB · PROJECT AGENCYOP DESCRIPTION010QUOTE020CHANGE ORDER030APPROVAL040SCHEDULE050BUILDNOT IN LASTYEAR'S SCOPEDOCK DOOR 2NEW 5-AXISBRIGHTWATERMACHINE.TEST/EQUIPMENT/5-AXIS/ELEVATION · DOCK, TUESDAYbrightwatermachine.test/equipment/5-axis/5-AXIS MACHININGXYZWORK ENVELOPEX 650 · Y 520 · Z 475 MMCUTS 6061, 17-4 PH, 316JOBS: IMPELLERS, MANIFOLDSSEND A DRAWINGJOB: ADD NEW MACHINE TO SITEC · A PROGRAMOP DESCRIPTION010BUILDONE OP. FROM THEBLUEPRINT RECORDAPPROVED BYTHE SHOPRELEASEDONE WORK QUEUEONE TICKETEQUIPMENT PAGE+ WORK ENVELOPENEXT MACHINE:SAME ROUTE, ONETICKETTuesday, 7:00 AM: the machine is on the floor; the site says 3-axis.One ticket in the program: the crate's tag carries the new page.DWG IM-605 · PART 6 FILL THE FLOOR · HIRE, AGENCY OR PROGRAMBRIGHTWATER MACHINE IS INVENTED · ENVELOPE FIGURES ILLUSTRATIVESAID / RELEASEDPENCIL: TRUE, NOT SAIDSHT605TITLENEW MACHINE ON TUESDAYINDUSTRIAL MARKETING · AS BUILT · SCALE NTSREVFILLUSTRATION

New Machine on Tuesday

What Foundation includes

Baseline tech, and reach through your own website. The plan picks the order.

  • Website tech

    Hosting, care, security and updates, so the site stays fast and sound.

  • Your Blueprint plan steers

    The work your company needs, ranked by the jobs you want more of. We take the next item off the plan, ship it and move to the next.

  • Unlimited email

    Ask a question, send a change, flag a new machine. Email us whenever you need to.

  • 2 Huddles a month

    15-minute calls on request, for anything that needs talking through.

  • The weekly brief

    What shipped, what's in progress, what's next, and any decision we need. You decide by replying.

  • One work queue

    Every ask goes into one queue, ranked against your plan. One job finishes, the next one starts.

How the plan steers

Your Blueprint ends with a plan: the work your company needs, in the order that wins the jobs you want. In Foundation, that plan is the routing. We work through it, and the weekly brief shows where each job stands.

The plan picks the tools, because not every company needs every one. A machine shop may need capability pages and search first. A distributor may need email to the accounts it already has. A coatings company may need its process pages and a capability statement. The toolkit is the same in every program; what your company uses comes from its plan.

How a month runs

The same loop every month, so your team knows what's coming.

  1. Step 1, OP 10

    Work the plan

    We take the next jobs off your plan, plus anything you added to the queue.

  2. Step 2, OP 20

    Ship

    Pages, emails, posts or ads, each written from your Blueprint and approved by your people before it goes public.

  3. Step 3, OP 30

    Brief

    Every week: what shipped, what's in progress, what's next. Reply to decide, or to add to the queue.

  4. Step 4, OP 40

    Learn

    SiteSonar shows which companies read what. That points to what the plan does next.

Who Foundation is for

Foundation suits industrial companies with a clear goal and a team that's happy to steer by email. A job shop that wants its capabilities on the page and kept current. An equipment maker that needs application pages for the models it already sells. A distributor that wants its lines found.

If you want someone on our side reading results and changing the plan with you, look at Growth.

Questions

Who decides what gets worked on?

Your Blueprint plan sets the order. You can add to it or change it by replying to the brief, and we rank each ask against the plan.

What's a Huddle?

A 15-minute call you ask for when something needs talking through. Foundation includes two a month. Anything raised goes into the queue.

Can we talk to someone more often?

Yes. Growth adds a strategist who steers the work with you, unlimited Huddles and two planning calls a month.

Who owns the website and domain?

You do. How ownership and leaving work is written on How we work.

How much does Foundation cost?

It depends on what your Blueprint finds. We scope it with you on the review call after your free Buyer's-Eye Audit and put it in writing before you commit.

We just redesigned our site. Do we start over?

No. We start from what's there and fix what buyers can't find first. The redesign checklist shows what we check.

Bring us the goal

Foundation starts with your Blueprint. Book 20 minutes and we'll tell you how yours would route the work.