A 6-MINUTE STORY · ILLUSTRATION

The five-minute screen: how a supplier-quality engineer reads your capability statement

She reads it like an inspection report. Fields she can verify pass, adjectives fail, and missing registry fields end the review before anyone calls.

Ashgrove Precision is an invented machine shop with a common problem: a capability statement nobody has touched since 2019. Pick the work you want, then scroll. We'll read it the way an SQE at a defense prime reads it, with five minutes on the clock.

1 2 3 4 5 6

FOR DEFENSE · AEROSPACE · MEDICAL · ANYONE SELLING TO PRIMES

THE WORK I WANT

SCROLL TO START THE CLOCK ↓

AS SAID · THURSDAY 2:15 PM

Twenty suppliers before five.

It's 2:15 on a Thursday. A supplier-quality engineer at a defense prime has a new program and a source list to build: twenty suppliers to screen before five. That leaves her about five minutes each, so she reads every capability statement the way she reads an inspection report. Field by field. Pass, or not shown.

Yours is a 2019 PDF. It opens with “Quality is our #1 priority” over a photo of the building. It lists precision machining, tight tolerances and aerospace experience. There is no NAICS code, no CAGE code and no UEI.

The quality line doesn't say which standard, which registrar or when the certificate expires.

ILLUSTRATION · INVENTED SHOP AND ENGINEER · ASHGROVE-PRECISION.TEST

NEXT: THE READ ↓

THE READ · TWELVE CHECKS

Twelve checks.

She numbers the twelve things she needs to check, the way an inspector numbers the features on a drawing. Registry identifiers: not shown. Quality registration and scope: not shown. Machine envelopes: not measurable. Materials, listed as “exotics”: not measurable. Special processes, and who runs them: not shown. Past performance, “aerospace experience”: not measurable. Date: 2019.

RED: NOT SHOWN OR NOT MEASURABLE · BLURRED: TRUE ON THE FLOOR, NOT ON THE PAGE · ILLUSTRATION

NEXT: THE COST ↓

THE COST

She marks it NOT SHOWN and moves on.

She can't verify an adjective, so she marks the statement NOT SHOWN and moves to the next supplier. She doesn't call to ask. She has nineteen more to read, and your shop never learns it was on the list.

You may run every process on her list. On paper, she couldn't find the proof in five minutes.

0 OF 12 VERIFIED · 0 CALLS · ILLUSTRATION

FIVE MINUTES IS THE STORY'S PREMISE, NOT A MEASUREMENT

NEXT: AS BUILT ↓

AS BUILT · ON THE FLOOR

Every field was true. None was on the page.

On the floor, nothing she checked was in doubt. The AS9100D certificate hangs in the lobby with its registrar and expiry date. The CAGE code and UEI sit in an active SAM record. The machine list has every envelope, the material certs name every alloy, and the heat-treat partner's approval is in the quality file. It's all true on the floor. None of it is on the statement, so none of it reached her.

She can't call twenty suppliers to ask. What isn't on the page doesn't exist for the screen.

SAM: THE US GOVERNMENT'S SYSTEM FOR AWARD MANAGEMENT · NO CAGE OR UEI VALUES ARE SHOWN · ILLUSTRATION

NEXT: THE CHANGE ↓

THE CHANGE · BLUEPRINT

Write it from the floor, with a source for every line.

In the Buyers Blueprint, our paid onboarding, your capability statement comes from the cited record of your plant. Every line traces to a document, the on-site visit or your team's answers, and the registry fields come straight from your active SAM record. You get a commercial version, and a government version if you sell to primes. The same record builds your website pages, so the statement and the site say the same thing.

Each statement also teaches IKE, our Industrial Knowledge Engine, which fields buyers in your trade screen for. What IKE learns is manufacturing. Your record stays yours.

BLUEPRINT · PAID ONBOARDING · FIRST STEP OF EVERY PROGRAM

FEEDS IKE · NOTHING GOES PUBLIC WITHOUT YOUR YES

NEXT: RELEASED ↓

RELEASED · ILLUSTRATION

The same statement, in ink.

Same shop, same afternoon, a new statement. NAICS codes, primary first. CAGE and UEI that match the shop's SAM record. AS9100D with its scope, registrar and expiry date. Envelopes, materials and tolerances in numbers. Heat treat and penetrant inspection named, with who runs each one and how requirements flow down. Part families the shop is allowed to name. One named contact with a direct line. Dated this year, and saying what the website says.

Every check passes. The shop goes on the list, and the next call is about a part.

REDLINE LAYER

12 OF 12 VERIFIED · ON THE SOURCE LIST · ILLUSTRATION, NOT A PROMISE

NEXT: YOUR TURN ↓
Drawing IM-106: Ashgrove Precision's capability statement under first article inspection The 2019 capability statement on the left, an empty inspection report beside it, general notes, a source list of twenty suppliers and a title block with a stopwatch reading 5:00. The true facts on the page are blurred: the statement never says them.
SHE CAN VERIFYPASS
0/12
NOT SHOWNFAIL
0/12

TWELVE THINGS AN SQE CHECKS · ILLUSTRATION

VIEW: THE 2019 PDF, AS SAID
Ashgrove Precision · twelve things an SQE checks · illustration
FieldOn the 2019 PDFHer resultAs builtAfter release
1 · NAICS codesNot on the pageNot shown332710 (primary) and 336413In the registry block
2 · CAGE codeNot on the pageNot shownOn file in SAM (value not shown here)Matches SAM
3 · UEINot on the pageNot shownOn file in SAM (value not shown here)Matches SAM
4 · Quality standard“Quality is our #1 priority”Not shownAS9100D certificate in the lobbyNamed on the page
5 · Scope, registrar, expiryNot on the pageNot shownOn the certificate, expires Sep 2027Named on the page
6 · Machine envelopes“State-of-the-art equipment”Not measurable5-axis 24 × 18 × 18 in, Swiss to Ø1.25 inIn numbers
7 · Tolerances“Tight tolerances”Not measurableBores ±0.0002 in to Ø2 in, CMM checkedIn numbers
8 · Materials“Exotics”Not measurableTi-6Al-4V, Inconel 718 and 13-8 MoNamed
9 · Special processes“Secondary operations”Not shownHeat treat and penetrant inspection, with who runs each and flow-down on every PONamed
10 · Past performance“Aerospace experience”Not measurableGimbal housings for a Tier 1 guidance supplierNamed
11 · Contactinfo@ onlyNot shownA named quality manager with a direct lineNamed
12 · Date2019Out of dateCurrentDated this year, matches the website

Every check passes.

The released statement: every field in ink with its source, and every check passing on the inspection report. With the redline layer on, the 2019 adjectives show struck through.

RELEASED · DRAWN FOR DEFENSE WORK · ILLUSTRATION

REDLINE LAYER

106 · THE LESSON

Fields she can verify pass. Adjectives fail.

A supplier-quality engineer reads your capability statement like an inspection report. Fields she can verify pass, adjectives fail, and missing registry fields end the review before anyone calls.

The fix is a statement made of facts a buyer can check, dated this year, saying the same thing as your website.

AS SAID AND AS BUILT · ASHGROVE PRECISION · DRAWN FOR DEFENSE WORK · ILLUSTRATION
FIELDTHE 2019 PDFRELEASEDSOURCE
01 · NAICSNOT ON THE PAGE332710 (PRIMARY) · 336413SAM RECORD
04 · QUALITY STANDARD“QUALITY IS OUR #1 PRIORITY”AS9100DTHE CERTIFICATE
07 · TOLERANCES“TIGHT TOLERANCES”BORES ±0.0002 IN TO Ø2 IN · CMMTHE ON-SITE VISIT

AN INVENTED SHOP · EVERY FIGURE IS INVENTED FOR ILLUSTRATION · NO CAGE OR UEI VALUES ARE SHOWN

General notes

  1. The companies, people, websites and figures in this story are invented to show a pattern we see often. The NAICS industry codes are real.
  2. An SQE is a supplier-quality engineer. The inspection report is drawn in the style of an AS9102 first article inspection form.

BEHIND THE STORY · The capability statement guide · Be ready when a prime looks · How IKE learns

YOUR TURN · THREE YES OR NO CHECKS

Check your own

Three checks you can run on your own statement on Monday morning.

  1. Registry fields

    Does your statement show NAICS, CAGE and UEI where an SQE expects them, and do they match your SAM record?

  2. Numbers, not adjectives

    Does every capability carry a number: tolerance, envelope, material, volume? Cross out every adjective a buyer can't measure.

  3. Dated and matching

    Is it dated this year, and does your website say the same thing?

ANSWER ALL THREE · YOUR ANSWERS STAY ON THIS PAGE

You can't sell what you don't say.

  1. 01Title block
  2. 02As said
  3. 03The read
  4. 04The cost
  5. 05As built
  6. 06The change
  7. 07Released
  8. CHECKCheck your own